Agency Utilization Rates: The Number That Predicts Whether You'll Be Profitable Next Quarter
Most agency owners can't answer 'what's your utilization rate?' Learn the formula, role-based benchmarks, and capacity planning math.
Here's a question I ask every agency owner I talk to: "What's your utilization rate?"
Most can't answer it. Some guess. A few confidently give me a number that turns out to be wrong because they calculated it against a 40-hour week.
And that's exactly why their margins are thin.
Revenue tells you what happened last month. Utilization tells you what's going to happen next quarter. It's the difference between reading a history book and reading a weather forecast. One is interesting. The other keeps you from getting caught in a storm.
I've watched agencies go from 12% net margins to 30%+ by fixing one thing: they started measuring and managing utilization correctly. Not by squeezing more hours out of their team. By understanding the math behind capacity, pricing, and staffing decisions.
Let me show you how.
What Utilization Rate Actually Means (And Why Most Agencies Get It Wrong)
Utilization rate is the percentage of your team's available working hours that get billed to clients. That's it.
Here's the formula:
Billable Utilization Rate = (Billable Hours / Available Hours) x 100
Simple enough. But most agencies mess up the denominator.
The Available Hours Problem
The biggest mistake I see: agencies use 40 hours per week as "available hours."
Nobody has 40 billable hours per week. Nobody. Your people have meetings, respond to Slack messages, handle admin tasks, attend trainings, take lunch breaks, and do internal work. All of that eats into available time.
A realistic available hours number for an individual contributor is 32-35 hours per week. For a manager, it's even lower -- maybe 20-25 hours once you subtract one-on-ones, team meetings, strategy sessions, and cross-functional coordination.
Here's why this matters so much: If you calculate utilization against 40 hours, you'll think your senior designer is at 68% utilization with plenty of room for more work. Calculate it correctly against her actual 33 available hours, and she's at 82%. Push more work onto her plate and you're headed straight for burnout.
Available hours = Total working hours minus recurring non-billable commitments (meetings, admin, PTO, holidays, internal projects).
Get this number right or everything downstream is wrong.
The Role Differentiation Problem
The second mistake: treating everyone the same.
A junior developer and a creative director have fundamentally different jobs. The junior developer should be heads-down on client work most of the week. The creative director should be in strategy sessions, mentoring, pitching new business, and guiding the team's output.
If both are at 80% utilization, something is broken. The junior dev is fine. The creative director is doing zero leadership -- they're just an expensive individual contributor.
You need role-specific targets. One blended number for the whole agency tells you almost nothing useful.
Role-Based Utilization Benchmarks
These benchmarks come from working with dozens of agencies across creative, development, marketing, and consulting verticals. They're not arbitrary -- they reflect the reality of what each role needs to spend time on beyond client work.
| Role |
Target Utilization |
Red Flag Below |
Burnout Above |
| Junior Staff |
85-90% |
70% |
95% |
| Senior Staff |
75-80% |
60% |
90% |
| Manager |
40-50% |
25% |
65% |
| Partner/Owner |
20-30% |
10% |
50% |
Let me break down why these numbers are what they are.
Junior Staff: 85-90%
Junior team members should spend most of their time executing billable work. They have fewer meetings, fewer management responsibilities, and fewer strategic obligations. The 10-15% non-billable time covers team standups, learning on the job, and occasional internal tasks.
Red flag at 70%: If juniors are below 70%, either you don't have enough client work (sales problem), your scoping is off (they're doing work that isn't getting billed), or they're spending too much time in meetings they don't need to attend.
Burnout at 95%: Juniors at 95%+ have no breathing room. No time to learn, ask questions, or develop skills. They'll either burn out or plateau -- and both outcomes cost you.
Senior Staff: 75-80%
Seniors balance deep client work with mentoring juniors, participating in strategic discussions, and handling complex problem-solving that doesn't always map cleanly to a billable project.
Red flag at 60%: A senior at 60% is either being underutilized (expensive bench time) or drowning in non-billable busywork. Audit their calendar -- chances are meetings are eating their week alive.
Burnout at 90%: Seniors at 90% have no capacity for the mentoring and strategic thinking that justifies their higher rate. You're paying senior rates for junior output.
Managers: 40-50%
This is where agencies get it the most wrong. Managers should spend the majority of their time managing -- one-on-ones, project oversight, client relationships, process improvement, hiring. If a manager is billing 80% of their time, they're not managing anything.
Red flag at 25%: Below 25%, you likely have too many managers for the size of your team, or your managers are hiding in meetings that don't drive outcomes.
Burnout at 65%: A manager billing 65% is trying to do two full-time jobs. Client work will suffer. Management will suffer. They'll burn out within 6-9 months.
Partners/Owners: 20-30%
Owners should be working on the business, not in it. Business development, strategic planning, key client relationships, and company vision. Some billable work keeps them connected to the craft. Too much means no one's steering the ship.
Red flag at 10%: Either the owner has fully stepped back (which can be fine if the leadership team is strong) or they're spending all their time on activities that don't move the needle.
Burnout at 50%: An owner at 50% billable utilization has no time for growth. They're trapped in delivery. This is the "I built an agency to have freedom, now I'm a prisoner" scenario.
The Math: Why 90% Utilization Destroys Your Agency
Let me walk through two scenarios with real numbers. Same agency, same revenue potential. The only difference is target utilization.
Scenario A: The 90% Agency
Setup:
- 10-person team (all individual contributors for simplicity)
- 32 available hours per person per week
- Blended billing rate: $150/hour
- Target utilization: 90%
Weekly billable hours: 10 x 32 x 0.90 = 288 hours
Weekly revenue: 288 x $150 = $43,200
Sounds great. But here's what actually happens over 12 months:
Turnover: At 90% utilization, you'll lose 2-3 people per year. Industry data shows agencies running above 85% sustained utilization see 30-40% annual turnover. Let's say you lose 2.
Recruiting cost: $8,000-$15,000 per hire (job boards, recruiter fees, interview time). Call it $10,000 x 2 = $20,000.
Ramp-up time: New hires take 8-12 weeks to reach full productivity. That's 10 weeks at roughly 50% productivity for each new hire. Lost billable hours: 2 hires x 10 weeks x 32 hours x 0.40 (lost productivity) = 256 hours. At $150/hour, that's $38,400 in lost revenue.
Vacancy gap: Even with fast hiring, you'll have 4-6 weeks of open positions. Let's say 5 weeks x 2 people x 32 hours x 0.90 target = 288 hours lost. That's another $43,200 in revenue you can't deliver.
Quality costs: Overworked teams make mistakes. More revisions. More client escalations. More scope creep you can't bill for. Conservatively, quality issues cost 5% of revenue: $112,320 x 0.05 = $5,616 per quarter, or $22,464 annually.
Missed growth: At 90% utilization, you can't take on new work without someone quitting first. No capacity buffer means turning down opportunities or delivering poorly.
Total hidden costs of 90% utilization: roughly $124,000/year.
Effective annual revenue: ($43,200 x 48 working weeks) = $2,073,600 minus $124,064 in hidden costs = $1,949,536.
Scenario B: The 75% Agency
Same setup, different target:
Weekly billable hours: 10 x 32 x 0.75 = 240 hours
Weekly revenue: 240 x $150 = $36,000
That's $7,200 less per week. Sounds worse. But here's the full year:
Turnover: At 75% utilization, industry turnover drops to 10-15%. Let's say you lose 1 person.
Recruiting cost: $10,000.
Ramp-up cost: 1 hire x 10 weeks x 32 hours x 0.40 = 128 hours. That's $19,200.
Vacancy gap: 4 weeks x 1 person x 32 hours x 0.75 = 96 hours = $14,400.
Quality costs: Far fewer. Let's say 2% of revenue: $1,728,000 x 0.02 = $34,560.
But here's the upside: You have a 15% capacity buffer. That means you can absorb a new client without scrambling. You can handle team member sick days without missing deadlines. You can do business development. You can improve processes.
Total hidden costs of 75% utilization: roughly $78,160/year.
Effective annual revenue: ($36,000 x 48 weeks) = $1,728,000 minus $78,160 = $1,649,840.
The Comparison
On paper, the 90% agency makes $300,000 more. In reality, the gap shrinks to about $300,000 -- but the 90% agency is fragile, stressed, and losing institutional knowledge every time someone walks out the door.
And here's the kicker: the 75% agency can grow. They have capacity to take on new work. They have time to improve their processes. They have margin to raise their rates because quality is consistently high.
Within 18-24 months, the 75% agency almost always surpasses the 90% agency in revenue, margins, and team satisfaction. I've seen this play out over and over.
The Utilization Death Spiral
This is the pattern that kills agencies. It's predictable, it's preventable, and it destroys businesses every year.
Here's how it works:
Stage 1: Overwork. You push utilization above 85% because you "need the revenue." Everyone's maxed out. No slack in the system.
Stage 2: Quality drops. Tired people make mistakes. Revisions increase. Client satisfaction starts slipping. Projects go over budget because the team doesn't have time to scope properly or push back on creep.
Stage 3: People leave. Your best people leave first -- they have the most options. You lose institutional knowledge, client relationships, and productivity all at once.
Stage 4: Knowledge drain. The people who leave take undocumented processes, client context, and tribal knowledge with them. The remaining team scrambles to fill the gaps.
Stage 5: Panic hiring. You hire quickly to fill gaps. New hires are less effective. Existing team members spend time onboarding new people instead of doing client work. Utilization drops temporarily, but so does quality because institutional knowledge is gone.
Stage 6: Push harder. Revenue dipped during the transition, so leadership pushes utilization back up to compensate. And you're right back at Stage 1.
This cycle repeats every 12-18 months. Each revolution grinds away more institutional knowledge, more team trust, and more client goodwill.
The exit ramp: Set utilization targets at 75-80% for individual contributors, invest in documentation and SOPs so knowledge doesn't walk out the door, and build the operational infrastructure that makes sustainable growth possible.
Capacity Planning: How to Predict When to Hire
Utilization isn't just a backwards-looking metric. It's a forward-looking planning tool. Here's the framework.
Step 1: Know Your Current Capacity
Calculate total available billable hours per week across your team.
Total Capacity = Number of People x Available Hours Per Person x Target Utilization Rate
Example: 8 people x 32 hours x 0.75 target = 192 billable hours/week capacity.
Step 2: Know Your Current Demand
Add up all current client commitments in hours per week.
This requires time tracking. If you're not tracking time, you're guessing. And guessing is how you end up overstaffed or understaffed.
Step 3: Calculate Your Capacity Buffer
Capacity Buffer = (Total Capacity - Current Demand) / Total Capacity x 100
Example: Capacity is 192 hours. Current demand is 168 hours.
Buffer = (192 - 168) / 192 x 100 = 12.5%
What the buffer tells you:
| Buffer |
Status |
Action |
| 20%+ |
Underutilized |
Need more clients or fewer staff |
| 10-20% |
Healthy |
Room for growth, can absorb fluctuations |
| 5-10% |
Getting tight |
Start recruiting pipeline now |
| 0-5% |
At capacity |
Hire immediately or turn down work |
| Negative |
Over capacity |
Emergency: hire, outsource, or shed work |
Step 4: Factor in Your Pipeline
Don't just look at current demand. Look at what's coming.
Projected Demand = Current Demand + (Pipeline Revenue / Blended Rate x Close Rate)
Example:
- Current demand: 168 hours/week
- Pipeline: $30,000/month in proposals out
- Blended rate: $150/hour
- Historical close rate: 40%
Expected new hours: ($30,000 / $150) x 0.40 = 80 hours/month = 20 hours/week
Projected demand: 168 + 20 = 188 hours/week
New buffer: (192 - 188) / 192 = 2.1%
That's too tight. Time to start your hiring process now, not when you've already won the work.
Step 5: The Hiring Trigger
Hire when your projected utilization (current demand plus likely pipeline wins) exceeds 80% of capacity for more than 4 consecutive weeks.
Why 4 weeks? Because short spikes happen. A big project launching, end-of-quarter push, seasonal uptick. You don't hire for spikes. You hire for sustained increases.
Why 80%? Because by the time you post the job, interview, hire, and onboard someone, 8-12 weeks have passed. If you wait until you're at 95% to start hiring, you'll be at 100%+ for three months while the new person ramps up.
Plan ahead. Your hiring process itself should be operationalized so you can move fast when the data tells you it's time.
Step 6: The Capacity Planning Spreadsheet
Build a simple spreadsheet that tracks this weekly:
| Metric |
Week 1 |
Week 2 |
Week 3 |
Week 4 |
Trend |
| Total capacity (hrs) |
192 |
192 |
192 |
192 |
Flat |
| Current demand (hrs) |
168 |
172 |
175 |
180 |
Up |
| Utilization % |
87.5% |
89.6% |
91.1% |
93.8% |
Up |
| Buffer % |
12.5% |
10.4% |
8.9% |
6.3% |
Down |
| Pipeline (hrs) |
20 |
25 |
25 |
30 |
Up |
| Projected demand |
188 |
197 |
200 |
210 |
Up |
| Projected util % |
97.9% |
102.6% |
104.2% |
109.4% |
Critical |
This agency needs to hire yesterday. The trend is clear. Three weeks from now, they literally cannot deliver on their commitments with the current team.
Making Utilization Actionable: The Weekly Review
Knowing your utilization is useless if you don't act on it. Here's the weekly process that makes the numbers matter.
Every Monday: 15-Minute Utilization Check
Pull last week's numbers. Answer three questions:
- Who's above target? Are they heading toward burnout? Can you redistribute work?
- Who's below target? Is it a workload issue, a tracking issue, or a skills mismatch?
- What's the trend? Is overall utilization creeping up or down?
Every Month: Capacity Planning Review
Update your pipeline projections. Recalculate your buffer. Decide whether you need to adjust staffing.
Every Quarter: Benchmark Comparison
Compare your utilization by role to the benchmarks in this article. Are your seniors doing too much billable work? Are your juniors underutilized? Are your managers managing or just doing?
This is also when you should look at the connection between utilization and your margins. High utilization with thin margins usually means your rates are too low. Moderate utilization with strong margins means you've found the sweet spot.
The Five Utilization Calculation Mistakes That Cost Agencies Money
Mistake 1: Using 40 Hours as the Denominator
Already covered this, but it's worth repeating because it's the most common error. Use actual available hours after subtracting known non-billable commitments.
Mistake 2: Not Differentiating by Role
A blended company-wide utilization number hides problems. Your average might be 75% while juniors are at 55% and seniors are at 95%. Both are serious issues. Track by role, identify by individual.
Mistake 3: Counting Internal Projects as Billable
Redesigning your website, building internal tools, writing blog posts -- these are valuable but they're not billable. Don't count them in the numerator. Track them separately as "strategic non-billable" if you want, but keep them out of your utilization calculation.
Mistake 4: Ignoring Contractor Hours
If you use freelancers and contractors, track their utilization separately. They typically run at 80-90% because you're engaging them for specific, focused work. But their hours need to be part of your capacity planning math.
Mistake 5: Measuring Monthly Instead of Weekly
Monthly utilization reports are rearview mirrors. By the time you see a problem, it's been happening for weeks. Track weekly so you can course-correct before small issues become big ones.
What to Do Next
Here's your action plan for the next 5 business days:
Day 1: Set up time tracking if you don't have it. Harvest, Toggl, or Clockify all work. Make it mandatory.
Day 2: Calculate available hours for each role on your team. Subtract recurring meetings, admin time, and other non-billable commitments from total working hours.
Day 3: Pull your last month's time data and calculate utilization by person. Compare to the role-based benchmarks in this article.
Day 4: Build your capacity planning spreadsheet. Calculate your current buffer and projected utilization based on pipeline.
Day 5: Make one decision based on the data. Redistribute work, start a hiring process, cut unnecessary meetings, or raise your rates.
The agencies that consistently hit 25-35% net margins aren't working harder than you. They're measuring utilization, planning capacity mathematically, and scaling with systems instead of chaos.
You can keep guessing. Or you can start measuring.
Frequently Asked Questions
What is a good utilization rate for an agency?
For most agencies, 70-80% average utilization across the team is the sweet spot. This varies by role -- juniors should be at 85-90% while managers should be at 40-50%. The overall blended average landing in the 70-80% range means you're profitable, sustainable, and have enough buffer to handle fluctuations without burning out your team or missing deadlines.
How do you calculate billable utilization rate?
The formula is: Billable Hours divided by Available Hours, multiplied by 100. The critical detail most agencies miss is that "available hours" is not 40 hours per week. You need to subtract recurring meetings, admin time, PTO, holidays, and other non-billable commitments. For a typical individual contributor, available hours are closer to 32-35 per week. Using 40 as your denominator will make your utilization look artificially low and lead to overloading your team.
When should an agency hire based on utilization data?
Start your hiring process when projected utilization (current demand plus likely pipeline wins) exceeds 80% of capacity for 4 or more consecutive weeks. Because hiring, interviewing, and onboarding typically takes 8-12 weeks, waiting until you're at 95%+ utilization means your team will be overloaded for months before the new hire becomes productive. Use your pipeline close rate and capacity buffer math to project forward, not just measure backwards.
What is the utilization death spiral?
The utilization death spiral is a pattern where pushing utilization too high (above 85% sustained) leads to quality drops, which leads to team turnover, which causes knowledge drain, which triggers panic hiring, which temporarily depresses quality further, which leads management to push utilization even harder to compensate -- restarting the cycle. Each revolution erodes institutional knowledge, team trust, and client relationships. The exit ramp is setting sustainable utilization targets (75-80% for ICs) and investing in documentation so knowledge survives turnover.
Why is 90% utilization bad for an agency?
At 90% utilization, your team has no buffer for emergencies, sick days, onboarding, training, process improvement, or business development. You'll see 30-40% annual turnover (versus 10-15% at 75%), which means constant recruiting costs, ramp-up periods, and lost institutional knowledge. The hidden costs of turnover, quality issues, and missed growth opportunities can easily exceed the "extra" revenue you generate by pushing utilization from 75% to 90%. Short-term gains, long-term destruction.
How does utilization relate to agency profitability?
The relationship is direct but not linear. Higher utilization generally means higher revenue, but only up to a point. Beyond 80-85%, the hidden costs (turnover, quality issues, missed growth) start eating into margins. Additionally, utilization without rate optimization is only half the picture. A team at 75% utilization billing $175/hour will out-earn a team at 90% utilization billing $100/hour every single time. Focus on sustainable utilization at strong rates, not maximum hours at any rate.
Need Help Building Your Capacity Planning System?
If your utilization numbers are all over the place -- or you don't have utilization numbers at all -- that's a sign your agency's operational foundation needs work.
I help agency owners build the systems for tracking, planning, and scaling that turn gut-feel decisions into data-driven ones.
Book a free 30-minute call and we'll look at your current capacity situation, identify the gaps, and map out what it takes to get to predictable, sustainable growth.